Renovation of the 44year old 4star hotel; imprinting local design and heritage elements to the cooperate hotel chain in 100 days construction period.The refurbishment includes a new extended reception area, redesign of the all-day dining restaurant, extension of all 3 existing restaurants with an added café for the new double decker terrace, a full new pool area replaced with an innovative state of the arts 2level infinity pool highlighting on the stunning beach-front view producing the best sunset scenery in the country with the new contemporary exterior façade to go with the refreshing look.